ATTENTION

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

THE IMPACT OF SELECTED MACRO-ECNONOMIC VARIABLES ON LIVESTOCK PRODUCTION IN NIGERIA, 1972 – I994

ABSTRACT

Livestock sector plays a tangible role in the Nigerian economy, even though, it is still far from attaining self sufficiency. Thus government instituted a series of macroeconomic policies designed to improve the production of this sector. This study was carried out to determine the effect of exchange rate on livestock production over time, to assess the effect of other selected macroeconomic variables (interest rate, money supply, inflation rate, wage rates, producer prices and import levels of livestock items) on livestock production and to estimate the elasticities of livestock production with respect to the selected macroeconomic variables. The regression results revealed a positive relationship between livestock production and each of the policy variables (exchange rate, interest rate, wage rates, producer price and import level of livestock items) though the interest rates’ coefficient is not significant. Also a negative insignificant relationship exists between livestock production and each of the macroeconomic variables, money supply and inflation rate. The elasticities of livestock production with respect to each of the policy variables-exchange rate, interest rate, money supply, inflation rate, wage rate, producer prices and import level of livestock items was found to be 0.0696, 0.112767, – 007323, – 0.063678, 0.362937, 0.437438 and 0.22085 respectively indicating that varying the level of the policy variables by one unit will lead to increase in the livestock production by the corresponding amount of elasticities.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *