BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
WHATSAPP US ON 08137701720
FINANCIAL PLANNING AND CONTROL A KEY TO MANAGEMENT EFFICIENCY A FINANCING OF GOVERNMENT PARASTATALS (A CASE STUDY OF POWER HOLDINGS PLC)AS A STUDY OF NIGERIA BREWERIES NINTH MILE CORNER ENUGU
TABLE OF CONTENT
Title page i
Approval page ii
Dedication iii
Acknowledgement iv
Abstract v
Table of content vi
List of table /figures ix
CHAPTER ONE
1.0 Introduction
1.1 Background of the study
1.2 Statement of problem
1.3 Purpose of study
1.4 Hypothesis
1.5 Delimitation of the study /scope
1.6 Significance of the study
1.7 Assumption of the study
1.8 Definitions of terms peculiar to the study
CHAPTER TWO
2.0 Literature review
2.1 Introduction
2.2 Definition framework of an accounting system
2.2.1 Conceptual design of an Accounting system
2.2.2 Component of an accounting system
2.2.3 Revenue recognition and income reporting
2.2.4 Nature of revenue
2.2.5 Revenue recognition
2.3 Accounting control in relation to the accounting system
2.3.1 Budgeting
2.3.2 Budget system
2.3.3 Types of budget
2.3.4 Budgeting control system
2.4Computer accounting
2.4.1 Spreadsheet pages
2.4.2 Application of spread sheet
CHAPTER THREE
3.0 Research methodology
3.1 Research design
3.2 Areas of study
3.3 Population of the study
3.4 Limitation of the study
3.5 Implication of the study
3.6 Instrument for data collection
3.7 Method of data collection
3.8Method of data of data analysis
CHAPTER FOUR
4.0 PRESENTATION ALAYSIS AND INTERPRETATION OF DATA
INTRODUCTION
4.1 Analysis of number of questionnaire sent out and returned.
4.2 Analysis of research question
4.3Results of testing of hypothesis
4.4 Observation
CHAPTER FIVE
5.0 Summary conclusion and recommendation
5.1 Summary of findings
5.2 Conclusion
5.3 Recommendation
Bibliography
Appendix I
Appendix ii
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420