ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COST N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR
YOU CAN CALL: 08068231953, 08137701720
WHATSAPP US ON: 08137701720
ECONOMIC EFFICIENCY OF RESOURCE USE AMONG URBAN WATERLEAF FARMERS IN AKWA IBOM STATE, NIGERIA
ABSTRACT
The study estimated the efficiency of resource use among urban waterleaf farmers in Akwa
Ibom State using a sample of 60 respondents that were randomly selected (20) from three
urban centers in the state. Interview schedules and structured questionnaires were
administered to elicit information from the respondents. Data were analyzed using
descriptive statistics, multiple regression and gross margin. The results showed that, most
(85%) farmers were within the economically active age bracket (21-50yrs). All the farmers
were female with a mean house hold size of eight. Majority (90%) of the farmers were literate
with a mean farming experience of 8.5 years.
The average farm size was 0.065ha, and
waterleaf was planted as a sole crop to obtain high output. The multiple regression analysis
showed that educational level, household size, farming experience, quantity of manure,
labour and farm size positively and significantly influenced the output of waterleaf in the
study area. The efficiency ratios of farm size (28.68), manure (42.11) and labour (0.91),
showed that waterleaf farmers were inefficient in the use of these resources. Land resource
and manure were underutilized, while labour was over- utilized. Gross margin analysis
showed that farmers made profit (Gross margin = N 287,252.52 per hectare). Lack of access
to credit facilities was the farmer’s major constraints. It is therefore recommended that credit
facilities should be provided to the urban farmers, and extension agent should take advantage
of the literate farmers to disseminate research information
HOW TO RECEIVE PROJECT MATERICAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420
http://graduateprojects.com.ng/