ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

WHATSAPP US ON  08137701720

THE ECONOMIC BENEFITS OF MINIMIZED MILL GOLD LOCK-UP AT ANGLOGOLD ASHANTI KOPANANG GOLD PLANT

Anglogold Ashantii?½s Kopanang Gold Plant (previously No. 9 Gold Plant) treats ore from Kopanang and Tau Lekoa shafts. The plant is twin streamed and has dedicated treatment circuits, from milling to final product, for each shaft. Waste rock material is used to compensate for the mill gap on both streams. Each stream consists of three 4.85 m x 9.15 m ROM mills in closed circuit with a single stage hydrocyclone, milling an average of 7 000 t per day. The liner configuration in each mill consists of six rows of 30 grid liners along with rectangular lifter bars. The topic of gold lock-up is not new and has been investigated and reported on many times, both within Anglogold Ashanti and the broader mining industry. Although the lock-up mechanism is understood, its measurement is neither practical nor precise. The initial lock-up in a new liner and the release as the liner wears down cannot be accurately quantified. Previous test work carried out on Kopanang Gold Plant (with a i?½gold scanneri?½) measured the natural gamma radiation emitted by uranium. This radiation is in proportion to the mass of concentrate locked up in the grid liner pockets, as well as between the cast-on backing plate and the shell. The ratio of concentrate lock-up was estimated as 35% behind the liners and 65% in the pockets. Mill gravity concentrates are recovered during routine relining operations from behind the grid liners at Kopanang Gold Plant. Prior to relining, the liners tend to release the concentrate from the pockets as the liners wear. Historical Kopanang data from actual i?½mill goldi?½ smelted indicates that an average of 29 kg gold is recovered from behind each row. This indicates a total lock-up of 250 kg gold per mill. This locked-up gold should preferably be minimized or eliminated for the following reasons: * The cyclic build-up and release of gold in mills complicates accounting * Gold concentrate arising from liners is a security risk and creates a major mechanism for gold theft * Loss of interest on the value of 250 kg fine gold is significant and was a major driver for the project. These factors led to the need to develop techniques to eliminate or at least minimize the gold lock-up in the mills. Wave liners, with rubber inserts, have been successful in eliminating lock-up, and were tested at Kopanang Gold Plant in November 2000. However, due to increased load-slip and high wear rates associated with these liners, this option proved less economical in terms of liner wear. Grid liners, with rubber-filled pockets, demonstrated a very high wear life and eliminated pocket lock-up. This system was successfully trialed in January 2003, but unfortunately did not prevent lock-up behind the liners. Current developments have resulted in a system that eliminates both pocket and backing plate lock-up. The conventional grid liner design has been modified to remove its steel backing plate. Rubber inserts that are integrated onto a rubber backing plate, have been designed to be used with the newly modified grid. The backing plate and grid pockets are now completely occupied by rubber, thus completely eliminating concentrate build-up around the new grid liner system installed in November 2003. Results to date are promising and liner life is expected to exceed conventional performance.

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *