ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
WHATSAPP US ON 08137701720
LIFE CYCLE ASSESSMENT OF GREENHOUSE GAS EMISSIONS FROM NAM THEUN 2 HYDROELECTRIC PROJECT IN CENTRAL LAOS
Conventional energy generation techniques such as coal and oil power plants release large amounts of greenhouse gases (GHGs) due to fossil fuel combustion while renewable energy sources, particularly, hydroelectric generation, are considered as climate-benign since they do not emit fossil carbon to produce energy. However, dams and their associated reservoirs are not entirely GHGneutral and their emissions need further investigation. In particular, reservoirs contribute to a major source of methane emission owning to the energy and material input in the construction and the decommissioning phase as well as the anaerobic decomposition of flooded biomass in the operation phase. This master’s project evaluates the greenhouse gas (GHG) emissions associated with Nam Theun 2 hydroelectric power plant in central Laos. A life cycle perspective is coupled with two Monte Carlo Simulations and time-specific global warming potential (GWP) for methane, all to predict the statistically most likely 100-yr GWP of Nam Theun 2. The stochastic models indicate GHG emissions of 2.5±0.5 gCO2 eq/kWh GWP in the construction phase, 75±5 gCO2 eq/kWh GWP in the operation phase and 0.60±0.05 gCO2 eq/kWh GWP in the decommissioning phase. The operation phase emission estimation is larger than previously believed (around 10 gCO2 eq/kWh for hydropower) due to the accounting for biomass decomposition. However, the hydropower plant is still significantly lower than the lifetime GWP of a typical coal plant (800-1000 gCO2 eq/kWh). A literature review on the topic of reservoir GHG emissions is conducted, an introduction of the Nam Theun 2 project is presented and GHG mitigation recommendations are provided for various stages of a dam’s life.
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420