BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
WHATSAPP US ON 08137701720
THE RELEVANCE AND APPLICATION OF STANDARD COSTING IN A MANUFACTURING INDUSTRY. (A CASE STUDY OF GEOLIS CABLE LTD NNEWI)
ABSTRACT
This project is exclusively undertaken to establish the relevant and application of standard costing in a manufacturing industry a case study focused on Geolis cable LTD Nnewi.
The application of standard costing in a manufacturing industry is relevant because it will help to reduce the cost of manufacturing and increase the profitability of the company.
TABLE OF CONTENT
Title page
Approval page
Dedication
Acknowledgement
Abstract
Table of content
CHAPTER ONE
Introduction
1.1 Background of study
1.2 Statement of problem
1.3 Objective of study
1.4 Significance of the study
1.5 Scope and limitation of the study
1.6 Statement of hypothesis
Reference
CHATPER TWO
Literature review
2.1 Definition and features of standard costing
2.2 The standard cost unit
2.3 The application and element of standard costing
2.4 Setting standard
2.5 The relationship between standard costing and budgeting control
2.6 The relevance of standard costing in a manufacturing industry
Reference
CHAPTER THREE
Summary of finding
3.1 Conclusion
3.2 Recommendation
3.3 Bibliography
Appendix
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
It is generally claimed that Nigerian manufacturing industries are growing geometrically and there is public critisms against this claim ranging from inefficiency of labor, waste of raw materials unpredictability, investment decision error etc.
The purpose of this study is therefore to clearly identify the importance and relevance of standard costing in a manufacturing companies and its contribution so far. However without a pure definition of the subject matter (Standard costing) and its explanation some readers may not easily understand its relevance and application in a manufacturing industry.
Standard costing is defined as a system of cost accounting which makes use of pre – determined cost relating to each element of cost layout, material and over head for each service supplied. (Nweze, 1998:86). Actual costs incurred and compared with the standard cost as the work proceeds, and the difference between the two is known as variance. And before standard cost can be calculated, there must be considered a number of basic condition which determined the standard cost which should be calculated (Nwoha and Ekwe, 1999:161). Alternatively standard costing relate to the cost and quality of inputs used in manufacturing goods or providing services (Garrison 1989:130).
Cost first developed is concerned primarily with recording and analyzing of historical this is to say, the actual cost which had already been uncured. It was soon realized that historical cost possessed some considerable disadvantages and limitation. for example, the actual cost of product of an article no matter how accurately it may have bee recorded provides no indication of the degree of efficiency with which has been provided, neither does it give any information about what the cost of production ought to have been or about what it could have been under different conditions of manufacturing.
Standard costing set out to determine what cost of production ought to be or could be under defined condition of production (Lucey, 1996:49).
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420